Blade Runner White Dragon Cut > Blade Runner > The making of “Leon’s ceiling hanging”

    The making of “Leon’s ceiling hanging”

    Blade Runner White Dragon Cut 5 including the newly created scenes is going to coming out November 2019.

    I have placed the bathtub and shower curtain along the wall opposite of the toilet on test editing of “Leon’s ceiling hanging”. but in fact, the bathtub was placed along the wall opposite of the door on original film.
    Yes, I made a mistake.

    The bathtub was placed along the wall opposite of not the toilet (the left illustration) but the door (the right illustration).

    I have remaked the CG of bathroom.

    Thanks to Mr.Christopher Platt for the suggestions about the installation place of bathtub.

    Leave a Reply

    Your email address will not be published. Required fields are marked *

    CAPTCHA